Lagoon lowering and raising dates

Posted on under General Info

The lowering of the lagoon started on April 27, 2017 and raising will start on May 27, 2017.
The lagoons 1 and 2 will be lowered sometime this fall (not scheduled yet), when a contractor has finished constructing a replacement weir (a small steel dam used for controlling water levels in the lagoon).

Leave a Reply